New Fernbank Elementary School
Following
the Ministry of Education announcement of capital funding in July 2020,
the Fernbank Community will be welcoming a new elementary school with
628 pupil places and 39 child care spaces. The school will be located
on the south/west corner of Rouncey Road and Cope Drive - 480 Cope Drive, adjacent to Rubicon Park.
The opening date is currently scheduled for September 2022. The
new school will be a dual-track kindergarten to grade 6 facility,
offering both an English program with Core French and an Early French
Immersion program.
The
new school’s attendance boundary will be bounded by Hazeldean Road to
the north, Iber Road and Robert Grant Avenue to the west, Fernbank Road
to the south, and Terry Fox Drive and the Carp River to the east (see
following attendance boundary map).
Kindergarten to Grade 6 English Program with Core French and Early French Immersion Attendance Boundary Map
For more detailed information regarding the school please access the following links:
https://ocdsb.ca/cms/one.aspx?portalId=55478&pageId=24034909
https://ocdsb.ca/cms/one.aspx?portalid=55478&pageid=30311420
New Fernbank Elementary School - Information Sheet
New Fernbank Elementary School - How to Register
New Stittsville Secondary School
Following
the Ministry of Education announcement of capital funding in March
2018, the Stittsville Community will be welcoming a new secondary school
with 1353 pupil places to serve grades 7 to 12 students in the
Stittsville area. The school will be located on the south/west corner of
Robert Grant Avenue and Cope Drive – 700 Cope Drive.
The opening date is scheduled for September 2023. The
new school will offer an English program with Core French, an Early
French Immersion program, and a Middle French Immersion program to grade
7 and 8 students. It will offer English and French Immersion
programing for grade 9 to 12 students.
The
new school’s attendance boundary will be bounded by Highway 417 to the
north, Fallowfield Road to the south, and Terry Fox Drive and the Carp
River to the east (see following attendance boundary maps).
For more detailed information regarding the school please access the following links:
https://ocdsb.ca/cms/One.aspx?portalId=55478&pageId=31792082
https://ocdsb.ca/cms/one.aspx?portalid=55478&pageid=30311420
New Half Moon Bay Elementary School #2
Following
the Ministry of Education announcement of capital funding in July 2020,
the Half Moon Bay Community in south Barrhaven will be welcoming a new
elementary school with 674 pupil places and 39 child care spaces. The
school will be located on the south/west corner of River Mist Road and
Kilbirnie Drive – 989 Kilbirnie Drive.
The opening date is currently scheduled for September 2023. The
new school will be a dual-track kindergarten to grade 6 facility,
offering both an English program with Core French and an Early French
Immersion program.
The
new school’s attendance boundary will be bounded generally by Cambrian
Road to the north, Borrisokane Road to the west, Barnsdale Road to the
south, and Longfields Drive and Prince of Wales Drive, to the east (see
following attendance boundary map).
Kindergarten to Grade 6 English Program with Core French and Early French Immersion Attendance Boundary Map
For more detailed information regarding the school please access the following links:
https://ocdsb.ca/cms/One.aspx?portalId=55478&pageId=33595193
https://ocdsb.ca/cms/one.aspx?portalid=55478&pageid=30311420
New Riverside South Secondary School
Following
the Ministry of Education announcement of capital funding in October
2020, the Riverside South Community will be welcoming a new secondary
school with 1516 pupil places, along
with two child care rooms with 39 licensed child care spaces. This will
be the first secondary school for the OCDSB in the growing Riverside
South community
The new Riverside South Secondary School will be located at the intersection of Spratt Road and Earl Armstrong Road. The opening date is scheduled for September 2024.
With the funding now approved, the OCDSB will be able to establish timelines for the building process.